This is the upstairs above the bank.

These are the before pictures:

June 8, 2015

We finally got the upstairs floor cleared and the nasty ceiling pulled down.

It only took 4 loads in this trailer. These bags weighed about 60 pounds each and there were about 30 per trip.

And it took 3 loads like this.  One pile burned to hte ground in less than 9 minutes.

We are now working on the windows, hanging drywall on theceiling, and refinishing the floors.