There has been a lot of progress since the last update. There was a very nasty ding in the roof that took some considerable time to hammer and dolly out:
The Drivers side kick-pad is done. I fabbed the panel from scratch:
The drivers cab corner is ready for final weld and finish:
The passenger corner is in: The passenger kick panel is under construction. Lots of fabbing and custom work needed here: The pillar was also creased parrallel with the doorjamb.
This came out fairly easily once I was able to drill some holes and slide hammer out the dent:
The louvers will take a bit more straightening, but that is all finish work for now.
The firewall is next: Clint has cut out the opening and fabbed a plate:
I'll add some beads to it and we'll get the Masked Welder to weld it in. |